Increasing cost pressures, strong competition, stricter statutory directives, and high energy prices are great challenges for energy-intensive industries such as chemicals and pharmaceuticals. Plants can only remain economical in the future if the owners continuously modify them in accordance with the current demands.
With its Premium Service "Energy study", Siemens offers you holistic solutions with associated process optimization options for reducing operating costs. The Premium Service "Energy study" has a modular structure. The range of services covers evaluation of the plant's energy requirements, the preparation of a feasibility study for effective energy-saving measures, up to specific implementation of the determined measures in the plant.
The Premium Service "Energy study" consists of three modules which build upon each other and which can be ordered individually:
Note:
The modules of the Premium Service "Energy study" do not include any traveling expenses. Traveling expenses from the Hoechst Industrial Estate, Frankfurt am Main, Germany, will be invoiced separately.
These advantages are partially dependent on the plant size and the production capacity. The difference they make primarily depends on the industrial characteristic of the process.
Siemens AG
Industry Sector
Industry Automation Division
Industrial Automation Systems
Hoechst Industrial Estate, Building K801
D-65926 Frankfurt
Phone: +49 69 305 305 69
E-mail: team-ec.industry@siemens.com
Additional information is available on the Internet at: